«

»

Print this Post

Bond – Lighting Project underway

LED lighting installation, part of our 2017 Bond Projects, is underway at BCHS. Better lighting, reduced electrical consumption and lower utility costs.

Classroom with existing lighting:

OldLights

 

Classroom with new LED lighting:

Permanent link to this article: http://www2.bcreek.k12.mi.us/?p=14222